Employing its Jumbo Javelin vessel, it installed 131 TPs at a rate of more than one a day, ferrying out nine 300-tonne TPs at a time, stowed vertically in the hold.
This is the first time that TPs have been transported and installed by a free-floating vessel using dynamic positioning - a computer controlled system that automatically maintains position and heading via propellers and thrusters.
Greater